Projects
19 Results
- 
                                        
    
                
            
      UC Davis Health 48X Complex – (read more)390 prefabricated panels were designed and manufactured to meet the seismic requirements for the state of California. 
- 
                                        
    
                
            
      Crusoe Energy AI Data Center on Lancium Clean Campus – (read more)DBC supported the project from its earliest concept, starting as a napkin sketch, to a fully dried-in building in under five months. 
- 
                                        
    
                
            
      Southwest Healthcare Inland Valley Hospital Expansion – (read more)DBC modeled and manufactured a prefabricated exterior system for the seven-story, 290,000-sq.ft. medical center in Wildomar, CA, Universal Health Services (UHS) Southwest Healthcare Inland Valley Hospital Expansion. 
- 
                                        
    
                
            
      Southline – (read more)Southline is a dynamic mixed-use community located in South San Francisco near the city of San Bruno. 
- 
                                        
    
                
            
      UCSD Hillcrest Medical Campus Redevelopment – (read more)DBC designed, modeled, fabricated, and installed 156 X-Series sheathed panels for two exterior stair tower cores. 
- 
                                        
    
                
            
      10x Genomics Biotech Facility – (read more)To achieve the highest quality, DBC constructed a two-story mockup of prefabricated EIFS panels and punched windows for water pressure testing. 
- 
                                        
    
                
            
      San Francisco State University Science & Engineering Center – (read more)42,000-sq.-ft. of sheathed exterior panels were installed in only 13 days, averaging 12 panels per day. 
- 
                                        
    
                
            
      Meridian Medical Office Building – (read more)The award-winning design feature of the project is the 60-foot-long, 2-foot cantilevered "eyebrow" framing integrated into the CFS panels. 
- 
                                        
    
                
            
      Brownwood Hotel & Spa – (read more)DBC’s prefabricated sheathed exterior wall panels were wrapped in a façade of alternating EIFS and brick and topped with aged bronze-finished metal roof to match the desired aesthetic. 
- 
                                        
    
                
            
    Block 75 Hyatt Dual-Branded Hotel – (read more)DBC fast-tracked this design-build hotel project, fully installing each floor in 2-3 working days with a total of 600 exterior panels. 
- 
                                        
    
                
            
      Texas Health Resources - Alliance Vertical Expansion – (read more)Using DBC's prefabricated X-Series panels eliminates the need for scaffolding - increasing overall safety and installation efficiency. 
- 
                                        
    
                
            
      Canyon Ridge Hospital – (read more)DBC provided fully-finished exterior and interior panel systems for Canyon Ridge Hospital's expansion project. 
- 
                                        
    
                
            
      Joan & Sanford I. Weill Neurosciences Building – (read more)DBC manufactured and installed panelized interiors and exteriors for this world-class research facility. 
- 
                                        
    
                
            
    Mayo Clinic West Expansion Tower – (read more)DBC's X-Series prefabricated panels with integrated windows saved Mayo Clinic's award-winning healthcare expansion schedule significantly. 
- 
                                        
    
                
            
      Children's Hospital of Richmond at VCU – (read more)DBC manufactured 42,000-sq.-ft. of X-Series EIFS and MCM panels for the Children’s Hospital of Richmond at VCU Expansion project. 
- 
                                        
    
                
            
      David L. Conlan Center at Atrium Health Carolinas Rehabilitation – (read more)DBC manufactured 50,000-sq.-ft. of X-Series prefinished panels to achieve a clean, modern building aesthetic for Atrium Health's one-of-a-kind rehabilitation hospital. 
- 
                                        
    
                
            
      Takeda California, Inc. – (read more)DBC provided exterior panels for this project, one of Takeda’s global centers, researching debilitating gastrointestinal and neurological diseases. 
- 
                                        
    
                
            
      100/150 Hooper – (read more)100/150 Hooper is a micro-campus for makers and thinkers in San Francisco’s Design Center and Mission Bay districts. 
- 
                                        
    
                
            
      Tucson Electric Power - Phase II Campus Improvements – (read more)This project involved the construction of five new buildings and the renovation of an existing office building, together totaling nearly 140,000-sq.-ft. for the campus-wide development. 