AC Hotel Scottsdale North – (read more)
Prefabricated structural wall system saved the GC 10-12 weeks on their schedule, allowing MEP trades to start earlier than a traditional construction approach.
-
Brownwood Hotel & Spa – (read more)
DBC’s prefabricated sheathed exterior wall panels were wrapped in a façade of alternating EIFS and brick and topped with aged bronze-finished metal roof to match the desired aesthetic.
-
Baystate Medical Center – (read more)
DBC prefabricated over 122,000-sq.-ft. of N-Series interior wall panels. The panels had medical gases, low voltage, and electrical conduits roughed-in at an off-site facility.
-
Renaissance at West River – (read more)
DBC prefabricated five floors of load-bearing, CFS structures and one floor of joisted deck for this multi-living project.
-
Block 75 Hyatt Dual-Branded Hotel – (read more)
DBC fast-tracked this design-build hotel project, fully installing each floor in 2-3 working days with a total of 600 exterior panels.
-
Texas Health Resources - Alliance Vertical Expansion – (read more)
Using DBC's prefabricated X-Series panels eliminates the need for scaffolding - increasing overall safety and installation efficiency.
-
ReCenter – (read more)
DBC's prefabricated structural system reduced ReCenter's project schedule by three months, minimized weather delays, and solved trade worker deficiencies.
-
Trellis Chino Skilled Nursing Facility – (read more)
DBC’s load-bearing, light-gauge steel-framed structure enabled off-site fabrication in a safe, factory-controlled environment.
-
Canyon Ridge Hospital – (read more)
DBC provided fully-finished exterior and interior panel systems for Canyon Ridge Hospital's expansion project.