Projects
27 Results
-
Renaissance at West River – (read more)
DBC prefabricated five floors of load-bearing, CFS structures and one floor of joisted deck for this multi-living project.
-
Block 75 Hyatt Dual-Branded Hotel – (read more)
DBC fast-tracked this design-build hotel project, fully installing each floor in 2-3 working days with a total of 600 exterior panels.
-
Texas Health Resources - Alliance Vertical Expansion – (read more)
Using DBC's prefabricated X-Series panels eliminates the need for scaffolding - increasing overall safety and installation efficiency.
-
ReCenter – (read more)
DBC's prefabricated structural system reduced ReCenter's project schedule by three months, minimized weather delays, and solved trade worker deficiencies.
-
Trellis Chino Skilled Nursing Facility – (read more)
DBC’s load-bearing, light-gauge steel-framed structure enabled off-site fabrication in a safe, factory-controlled environment.
-
Canyon Ridge Hospital – (read more)
DBC provided fully-finished exterior and interior panel systems for Canyon Ridge Hospital's expansion project.
-
UC Davis - Yosemite Hall – (read more)
DBC’s off-site manufacturing provided a safe solution that minimized campus disruptions while keeping students safe.
-
UC Davis - Shasta Hall – (read more)
By integrating DBC’s prefabricated solutions, Shasta Hall opened ahead of schedule to help UC Davis guarantee the availability of campus housing to first-year students.
-
MilliporeSigma Manufacturing Facility – (read more)
DBC manufactured and installed N-Series non-load bearing and load-bearing panels for this manufacturing facility.