AC Hotel Scottsdale North – (read more)
Prefabricated structural wall system saved the GC 10-12 weeks on their schedule, allowing MEP trades to start earlier than a traditional construction approach.
-
Block 75 Hyatt Dual-Branded Hotel – (read more)
DBC fast-tracked this design-build hotel project, fully installing each floor in 2-3 working days with a total of 600 exterior panels.
-
Brownwood Hotel & Spa – (read more)
DBC’s prefabricated sheathed exterior wall panels were wrapped in a façade of alternating EIFS and brick and topped with aged bronze-finished metal roof to match the desired aesthetic.