Projects
6 Results
-
AC Hotel Scottsdale North – (read more)
Prefabricated structural wall system saved the GC 10-12 weeks on their schedule, allowing MEP trades to start earlier than a traditional construction approach.
-
Renaissance at West River – (read more)
DBC prefabricated five floors of load-bearing, CFS structures and one floor of joisted deck for this multi-living project.
-
ReCenter – (read more)
DBC's prefabricated structural system reduced ReCenter's project schedule by three months, minimized weather delays, and solved trade worker deficiencies.
-
Trellis Chino Skilled Nursing Facility – (read more)
DBC’s load-bearing, light-gauge steel-framed structure enabled off-site fabrication in a safe, factory-controlled environment.
-
UC Davis - Yosemite Hall – (read more)
DBC’s off-site manufacturing provided a safe solution that minimized campus disruptions while keeping students safe.
-
UC Davis - Shasta Hall – (read more)
By integrating DBC’s prefabricated solutions, Shasta Hall opened ahead of schedule to help UC Davis guarantee the availability of campus housing to first-year students.