Projects
In:
4 Results
-
10x Genomics Biotech Facility – (read more)
To achieve the highest quality, DBC constructed a two-story mockup of prefabricated EIFS panels and punched windows for water pressure testing.
-
Joan & Sanford I. Weill Neurosciences Building – (read more)
DBC manufactured and installed panelized interiors and exteriors for this world-class research facility.
-
MilliporeSigma Manufacturing Facility – (read more)
DBC manufactured and installed N-Series non-load bearing and load-bearing panels for this manufacturing facility.
-
San Francisco State University Science & Engineering Center – (read more)
42,000-sq.-ft. of sheathed exterior panels were installed in only 13 days, averaging 12 panels per day.