Projects
In:
4 Results
-
Renaissance at West River – (read more)
DBC prefabricated five floors of load-bearing, CFS structures and one floor of joisted deck for this multi-living project.
-
ReCenter – (read more)
DBC's prefabricated structural system reduced ReCenter's project schedule by three months, minimized weather delays, and solved trade worker deficiencies.
-
UC Davis - Yosemite Hall – (read more)
DBC’s off-site manufacturing provided a safe solution that minimized campus disruptions while keeping students safe.
-
UC Davis - Shasta Hall – (read more)
By integrating DBC’s prefabricated solutions, Shasta Hall opened ahead of schedule to help UC Davis guarantee the availability of campus housing to first-year students.